WOODCLIFF LAKE, N.J.—A former borough mayor received assurances Nov. 9 that future stormwater and sanitary waste infrastructure improvements — required by several large developments planned in town — will be addressed during future Planning Board hearings.
Moreover, council approved a separate stormwater management ordinance, which was required by the state environmental protection department (NJDEP) to be approved by January 2027.
Former mayor Josephine HIggins questioned whether existing infrastructure was capable of handling increased flows from stormwater runoff. Moreover, she also questioned if existing sanitary waste infrastructure could handle the new developments without costing existing homeowners more in property taxes.
Her comments were directed at the stormwater water management ordinance up for public hearing as well as pending developments.
Higgins pointed to ongoing development at the former BMW property, where 370 units are planned, and future development at the Hilton where 147 housing units, including 30 affordables, are proposed. Both properties are included in the borough’s fourth round affordable housing plan. The BMW property includes 34 affordables and a 26-unit supportive housing complex, with 40 beds.
Higgins’ main concern was making sure local taxpayers don’t get stuck with higher taxes for infrastructure upgrades due to large developments. “We have got to have these (developers) put money aside to increase the diameter of sewer and water systems,” she said. Higgins suggested that the council report back to residents on the issue.
Councilor Nicole Marsh, a Planning Board member, said that stormwater management is required of large developments and looked at during Planning Board reviews. She said developers are required to submit a stormwater management plan with their preliminary site plan application.
Also, council approved Ordinance 26-15, a 42-page stormwater control ordinance required by NJDEP that must be adopted before Jan. 29. 2027. Neglia Engineering prepared the ordinance, which was conditionally approved by Bergen County on Oct. 2. 2026.
The ordinance’s purpose is to establish minimum stormwater management requirements and controls for “major development,” as defined in the ordinance. The ordinance notes that a major development is an individual development or multiple developments that disturb one or more acres; create one quarter of an acre of motor-vehicle surface or impervious surface; or any combination of development or disturbance that impacts one-quarter acre or more.
In addition, the council approved two separate purchase orders to purchase bulk rock salt for winter use from two purchasing cooperatives, Somerset County Cooperative Pricing System and Bergen County Cooperative Pricing System. Council approved a contract for $50,000 via Somerset County and for $80,000 for Bergen County salt purchases.
